Repository navigation
test(mermaid): complete TL-U26 candidate feasibility corrections and evidence harness - #60
Conversation
…nst installed core
CI failure correctionAll three engines failed the same pointer regression: the absolutely positioned native State table intercepted clicks on the fallback The failed Vitest run also generated an untracked failure screenshot before source measurement ( |
…e; record evidence review
Exact-head feasibility evidence reviewVerified all workflows green on Actual desktop and mobile Sequence screenshots in all engines showed overlapping duplicate moving text and the fixed source-reference caption. The follow-up commit |
|
Architecture direction is under review in context PR #60. The revised target is generic semantic execution composition, with the compact player preserved and Mermaid proposed as an optional diagram backend. Do not treat this proof as production adoption, start U27, or merge as accepted on prior green evidence. Latest head 6063e07 failed CI; retain both negative outcomes and earlier exact green evidence for U26 disposition. No changes to this source branch in the governance task. |
|
CI diagnosis at 6063e07: 454 compiler/unit tests passed; both browser failures arose because the regression expected the selectable TL token text node to contain the whole message caption. Mermaid emits the wrapped text as separate sibling nodes (adapter emits caption + |
Scope
TL-U26 follow-up for F05/F06/F20/F31, based on main after #59. Development-only feasibility, not U27–U29 production cutover.
Explicit review decisions and remaining gates
Sequence bare arrow paths and phase boxes are decorative, not source selection targets; caption/reference pointer/keyboard selection and independent source controls replace direct bare-mark selection. Optional motion and participant visual binding still use guarded pinned SVG structure. Review this interaction tradeoff against MR-04/MR-10, not an implicit contract amendment. Graph reserved slots and legibility require actual browser proof. Process memory is sampled aggregate Node/descendant RSS (may double-count shared pages), not unique memory or exact instantaneous peak. Copied-adapter packed proof is not production package integration. No production dependency/version/export change, publication, ticket closure or cutover.
Validation
Final reviewed candidate head
8ef1b7e7b9f4946a3d6c718f3a84c7a2a79c5c86, four commits ahead and zero behind main at inspection. Isolated process-memory helper tests: 2/2 passed with Node 22.16.0; both copied file Git blob hashes verified against the exact head. Full repo clone failed due to GitHub DNS; Node 24 and pnpm unavailable locally. Full typecheck, browser, packed workload measurements, notice approval, actual AT and native zoom NOT PERFORMED locally. Exact-head workflow query returned no runs yet. Review all three engines and retained artifacts, record actual measured results and per-area reviewed go/no-go. Do not start TL-U27 before U26 acceptance.