Forensically-defensible CPM engine. AACE-canonical. Daubert-disclosed. Bit-identical JS<->Python parity.
-
Updated
Nov 28, 2026 - JavaScript
Forensically-defensible CPM engine. AACE-canonical. Daubert-disclosed. Bit-identical JS<->Python parity.
Supporting page for the manuscript titled "Unveiling Latency-Induced Service Degradation: A Methodological Approach with Dataset"
Interactive dashboard visualizing US flight delays and schedules, with dynamic filtering by city and year.
This project analyzes delivery performance and SLA compliance for a logistics operations dataset to identify delay patterns, SLA breach risks, and estimated cost leakage impacting business efficiency.
Auditing minimum connection time standards at U.S. hub airports using BTS On-Time Performance and DB1B data. January 2019, Python.
A mini prelim project for Data Warehousing, Global Supply Chain & Logistics Delay Tracker
High-speed 8×8 Dadda multiplier designed in 45nm CMOS technology with hybrid transmission gate/CMOS logic. Features 4:2 compressor-based partial product reduction, critical path delay of 0.204ns, and comprehensive delay & power analysis.
Analysis of food delivery delays using Python, Pandas, NumPy, and Tableau, focusing on traffic, peak hours, and vehicle performance.
Network Path and Delay Analyzer (PDA): End-to-end delay breakdown (propagation, transmission, processing, queueing) & Delay-Aware Adaptive Path Selection (DAPS) vs static OSPF routing simulation.
Developed an interactive Power BI dashboard to analyze construction project performance, manpower utilization, financial metrics, and operational delays using DAX, Power Query, and data modeling.
A real-time flight tracking pipeline and analytics engine that eliminates data lag. It processes live telemetry via Kafka and Spark to power an interactive map, while saving historical data for weather-related delay analysis.
GI/G/1 Queue Simulator with Bounded Algorithmic Numbers (BANs)
TTC subway delay analysis using Excel and Power BI to identify delay patterns by station, line, time, and weather.
To associate your repository with the delay-analysis topic, visit your repo's landing page and select "manage topics."