Skip to content

Patch Go toolchain and harden IRC connections - #185

Merged
variablenix merged 5 commits into
mainfrom
fix/gobot-audit-november
Nov 14, 2026
Merged

variablenix merged 5 commits into
mainfrom
fix/gobot-audit-november

Conversation

@variablenix

Copy link
Copy Markdown
Owner

IRC registration now times out and metrics report an IRC network connected only after registration completes. The IRC connection also bounds received line size and write duration. Password authentication requires server certificate verification, and startup/reload reject duplicate network names that would share storage and owner-account namespaces.

Use Go 1.26.11 for the November Go security fixes. CI reads the version from go.mod and the Docker builder uses the same patch release. Includes the reviewed chromedp and CodeQL dependency updates from #183 and #184.

Validation: race tests with the offline Chrome fixture, go vet, module verification, actionlint, and govulncheck.

dependabot Bot and others added 5 commits November 9, 2026 03:52
Bumps [github.com/chromedp/chromedp](https://github.com/chromedp/chromedp) from 0.21.0 to 0.23.0.
- [Release notes](https://github.com/chromedp/chromedp/releases)
- [Commits](chromedp/chromedp@v0.21.0...v0.23.0)

---
updated-dependencies:
- dependency-name: github.com/chromedp/chromedp
  dependency-version: 0.23.0
  dependency-type: direct:production
  update-type: version-update:semver-minor
...

Signed-off-by: dependabot[bot] <support@github.com>
Bumps [github/codeql-action](https://github.com/github/codeql-action) from 4.39.1 to 4.39.3.
- [Release notes](https://github.com/github/codeql-action/releases)
- [Changelog](https://github.com/github/codeql-action/blob/main/CHANGELOG.md)
- [Commits](github/codeql-action@v4.39.1...v4.39.3)

---
updated-dependencies:
- dependency-name: github/codeql-action
  dependency-version: 4.39.3
  dependency-type: direct:production
  update-type: version-update:semver-patch
...

Signed-off-by: dependabot[bot] <support@github.com>
@variablenix
variablenix merged commit 995291b into main Nov 14, 2026
3 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant